1 / 5- Sun-hours lookup
- Electrician's step
- 10-minute checklist
- 62 printable pages
DIY solar · Guide and workbook
Size the system before you order parts.
A 62-page guide and workbook for a small off-grid system, or for a grid-tie design you hand to a licensed electrician for the final connection.
- A 10-minute checklist: system type, watt-hours, a sun-hours lookup, permits and shade
- Chapter 1 formulas for panels, batteries, the charge controller and the inverter, with a worked cabin example
- Ground-mount steps for a first build, and shed-roof mounting that stops before a primary-residence roof
- A DC wiring order, commissioning checks, and the jobs that stay with a licensed electrician
The DIY Solar Panel Installation Guide
£21
- +One combined 62-page PDF, guide and workbook in a single file
- +A ZIP with that PDF and a README
One-off payment. Download straight after checkout.
30-day refund. If it isn't useful, reply to your receipt within 30 days for a full refund.
Instant PDF Print or tablet Any device
What it is+
A planning and installation guide for a ground-mount or off-grid solar setup, with the workbook checklist in the same PDF. You size the system from your own devices and sun hours, then follow mounting and low-voltage DC wiring for a system that stays off the house wiring. Grid-tie design stops at the racking and the panels. The final connection is written up as a licensed electrician's job.
What's inside+
A scope notice, a 10-minute quick-start, and six chapters: sizing, a shopping list, racking, DC wiring, commissioning, and maintenance. The cabin figures are a worked example. A closing note explains why the book will not give you a payback period.
How to use it+
Read the scope notice, then the quick-start, and look up peak sun hours before you buy. Chapter 1 is the sizing pass. Order from the Chapter 2 list. Follow Chapters 3 to 5 in order for the mount, the DC wiring and commissioning. Keep Chapter 6 for after something is installed. If the project is grid-tied, stop and hand the interconnection to a licensed electrician.
Delivery and refunds+
Instant download after payment: a ZIP with the 62-page PDF and a README. Refunds follow the policy shown at checkout.
Made for the evening you almost order the panels

A shed, cabin, RV or backup kit
You want power that never meets the house wiring. The guide treats that as the full DIY path: design, mount, wire and use, and it still opens with the safety notice.

A grid-tie design, and a hand-over
You can take design, racking and panel placement through the book. Interconnection into the home's main panel is marked for a licensed electrician, a permit and the utility's process.

A wattage, and no sun hours yet
A panel size from a forum skips the sum. Chapter 1 starts with each device's watts and hours, adds a 20 to 25 per cent buffer, and asks you to look up peak sun hours for your site.
The problem
The panel wattage arrived before the sums
A wattage from a kit page is an easy place to start. It skips the figures this book puts first: what you actually run in a day, how many peak sun hours your site gets, and which parts of the job are allowed to touch the house wiring. Guess those and the shopping list is a guess too. The closing note also refuses a single payback period, because rates, shade, orientation and local incentives differ from one home to the next.


How it works
Your loads, your sun hours, then the hand-over
The quick-start is about 10 minutes, and it comes before any order. You pick off-grid or grid-tie, list the devices, look up peak sun hours, and check permits and shade. The book names NREL PVWatts, or a similar tool, for that sun-hours figure. Chapter 1 turns the notes into panel watts, battery amp-hours, a charge-controller rating and an inverter size. The cabin numbers in that chapter are a worked example, so you can see the arithmetic. Chapters 2 to 5 are the shopping list, the mount, the low-voltage DC wiring order and the commissioning checks. A grid-tie project is designed to stop at the home's main panel.
This guide vs generic solar advice
Why the shopping list waits for the sums
Chapter 1 starts with the devices. Watts times hours gives watt-hours for the day. A 20 to 25 per cent buffer covers losses in the controller, the inverter and the battery. In the cabin example that buffer takes 1,455 watt-hours to about 1,820. You replace every line with your own kit.
Panel wattage is that daily total, divided by your peak sun hours, then divided by 0.8. Four peak sun hours is only the example's winter figure, and it produces about 570 watts of panels. The chapter names different ranges for the US Southwest and for the Pacific Northwest and Northeast, and it tells you to look your own site up.
The opening notice splits the job. With reasonable care, the book walks through sizing, a ground-mount or a simple shed or outbuilding roof, and DC wiring from the panels to a charge controller, a battery bank and an inverter, for a system that never joins the house wiring. Main-panel connections, grid-tie interconnection, work inside existing house wiring, and grid-tied permit sign-off are listed as licensed-electrician jobs.

Chapter 101
One daily total, four component sizes
From the daily watt-hours you size the panels, the battery bank, the charge controller and the inverter. Battery autonomy is written as one to three days. The cabin example continues at 12 volts, two days, and a LiFePO4 bank at about 90 per cent depth of discharge, which comes out near 337 amp-hours. The chapter compares that chemistry with lead-acid, including the ventilation flooded batteries need while charging. PWM controllers are described as a fit under about 200 watts. MPPT is described as about 20 to 30 per cent more efficient at turning panel output into charge, with the amp rating taken from the controller's own datasheet. A pure sine inverter is the one it tells you to size above the AC loads you will run together, with extra room for a motor's startup surge.

The mount02
Ground-mount for a first build
Chapter 3 recommends a ground-mount for most first builds. You want a site clear of shade in peak sun hours, southern exposure in the northern hemisphere, northern exposure in the southern. Posts and footings follow the rack kit's own engineering spec, because the frame is a wind-load structure. A fixed tilt near your latitude is the year-round starting point the chapter gives, with steeper for winter and flatter for summer if you can adjust it. Panel clamps go to the manufacturer's torque. A shed, garage or outbuilding roof is in the book only with mounts into the rafters and flashed penetrations. The chapter calls skipped flashing the top cause of DIY solar roof leaks. A primary-residence roof is set aside for a licensed solar installer, even when you keep the design and the component list.

The DC side03
Connect the battery before the panels
Chapter 4 is low-voltage DC only: panels, charge controller, battery, inverter. It does not cover a connection into the home's AC wiring or main panel. Panels go in series or parallel inside the controller's limits, on MC4 connectors, with UV-rated conduit where the sun hits the run. The connection order is the one many controllers need: battery first, so the controller can read battery voltage, and the solar input last. A DC breaker or fuse sits between battery and controller, and another between battery and inverter. The inverter lands on the battery bank, in a dry ventilated place, on cable sized for its draw. Grounding follows the equipment instructions and your local code. Chapter 5 then has you inspect, power the controller from the battery, connect the panels on a clear day, and test the inverter on a small known load before anything sensitive.

Start on paper
Three moves before you order a part.
1Step 1
Tick the 10-minute list
Mark off-grid or grid-tie. List the devices. Note that peak sun hours still need a lookup. Check the building department and the shade on the site.
2Step 2
Run the Chapter 1 sums
Watt-hours, the buffer, then panels, battery, controller and inverter. Keep the cabin figures as the example. Write your own in their place.
3Step 3
Mark the electrician's steps
Choose a ground-mount or a simple outbuilding roof from Chapter 3. If the system must meet the house panel, that connection stays on the electrician's side of the notice.
Timeline
What to expect
Sites, codes and sun hours differ. Here is how the book is designed to be used.
Read the notice and tick the list
Read the scope notice first. The 10-minute checklist is meant to leave you with a system type, a first device list, a sun-hours lookup done or still open, and a yes or no on permits and an electrician. The day is a planning pass. Installation comes later, and only on the path the notice allows.
What's inside
- Read this first: what you can do with reasonable care, and the four jobs that stay with a licensed electrician
- Quick-start checklist, about 10 minutes: goal, power calculation, permits and shade, plus a five-phase build roadmap
- Chapter 1, planning and sizing: device list, 20 to 25 per cent buffer, panel formula, battery autonomy, controller and inverter, with the cabin example
- Chapter 2, shopping list: panels, racking, MPPT or PWM, battery voltage, pure sine inverter, DC breakers, wire gauge, grounding, MC4 connectors
- Chapter 3, racking: ground-mount sequence, and shed or outbuilding roofs with flashed mounts. Primary-residence roofs are set aside
- Chapters 4 to 6: DC wiring order, six commissioning checks, and a maintenance table. The closing note refuses a generic payback figure
Preview the pages
Still have questions?
Is the workbook a separate file?+
You get one combined 62-page PDF. The guide and the workbook checklist are in that file. The ZIP also contains a README. Refunds follow the policy shown at checkout.
Can I connect this to my house's main panel?+
The guide does not teach grid-tie interconnection or any work on the home's main panel. The notice says that work needs a licensed electrician, a permit in nearly all of the US jurisdictions it describes, and usually utility interconnection approval. An off-grid system that never joins the house wiring is the path it walks through in full. The hand-over is described as standard practice, including for experienced installers who are not electricians.
Does it tell me when I will break even?+
No payback period is given. The closing note says cost depends on system size, component quality, local electrician rates, your electricity prices, real production, shade, orientation and current incentive programmes. It tells you to check your utility and your own area's schemes, and not to trust a generic 'this many years' claim, including one from this book.
Does it cover the roof of my house?+
A primary-residence roof is outside the DIY mounting steps. The chapter recommends a licensed solar installer for that roof, even if you handle design and component choice. Ground-mounts, and simple shed, garage or outbuilding roofs with flashed mounts into the framing, are the installs it walks through.
Whose electrical code is this written for?+
The scope notice talks about licensed electricians in nearly every US jurisdiction, and it points at NREL PVWatts for sun hours. It also tells you to check your local building department, HOA or similar rules, and your utility's interconnection process. It is educational. It is not a substitute for your local code, a permit inspection, or a professional sign-off. A UK reader still needs their own electrician and building control for anything that meets the house wiring.
Do I need a printer?+
The quick-start is a tick list, and Chapter 1 is a set of sums you write your numbers into. Print those pages if you want them beside the job. The same PDF can be read on a screen.
How do I get it?+
After payment you get an instant download: a ZIP with the 62-page PDF and a README. Refunds follow the policy shown at checkout.
Instant PDF download · 62 pages · Guide and workbook
Educational only. This guide does not authorise work on a main panel or a grid connection. Grid-tied and any panel-to-home wiring should be performed or signed off by a licensed electrician under your local electrical code. Incorrect wiring is a fire and shock hazard. Off-grid low-voltage DC setups carry lower but still real risk. Written with AI assistance, reviewed by AeternusVita.
The DIY Solar Panel Installation Guide




